Log for Practicum at VA Medical Center |
Date |
Hours |
Description of Job assignments |
3-Oct-00 |
4 |
Install computer at
workstation. Tour various bldgs. Throughout the Medical center. |
4-Oct-00 |
8 |
Change IP addresses on 26
computers located in bldg. 18. Ping and Tracert for IP addresses on DHCP
Servers and Print Servers. Install voice recognition software for Pathology. |
5-Oct-00 |
|
Off |
6-Oct-00 |
8 |
Charge new UPS Battery
back-ups and install. Install Service pack 4.0 for NT Workgroup. Install
Soundblaster software. Install I.E 4.0 upgrade. Deliver and install upgraded
computer to Pathology. |
11-Oct-00 |
8 |
Troubleshoot wireless
laptops in Bldg.19. Troubleshoot hub connections with Fluke in closet.
Troubleshoot 2 hubs in NOC not talking to each other. |
12-Oct-00 |
8 |
Inventory PC supplies. Move
PC's. Configure and install software on 2 new PC's.Installed NT Workstation.
Changed Static addresses to DHCP on appx. 10 computers in Bldg. 18.
Troubleshoot Laptop for network connection. |
13-Oct-00 |
8 |
Load all software for new
machine and deliver. Troubleshool printer and replace with known good one.
Troubleshoot IP address problem and domain name. Load more software. |
18-Oct-00 |
8 |
Move wireless hub and
antenna in Bldg. 19 for better coverage. Troubleshoot various user problems. |
19-Oct-00 |
8 |
Troubleshoot various user
problems, including host file updates. Attend wireless proposal by Sting Com.
Reconfigure machine with NT Workstation and others. |
20-Oct-00 |
8 |
Reformat hard drive on new
Intel PC. Install NT Workstation and other hospital-specific software.
Trobleshoot various user problems throughout the Medical Center. |
26-Oct-00 |
8 |
Travel to St.Joseph's Hosp.
In Reading to do updates on 10 computers located on 3rd floor, VA Satellite
Clinic. |
27-Oct-00 |
8 |
Clean and overhaul 2 older
PC's. Troubleshoot modem problems. Troubleshoot various problems throughout
the Medical Center. |
1-Nov-00 |
8 |
Trouble calls throughout the
medical center including cleaning 4 color HP printer and their cartridges.
Start config. And install of 2 new Intel PC's with their various
"Hospital specific" applications. |
2-Nov-00 |
8 |
Gather PC repair disks for
PC's throughout the Medical Center. Finish install of various applications on
2 new Intel PCs. |
3-Nov-00 |
8 |
Troubleshoot various user
problems throughout the Medical Center.Work on inventory system of PC repair
disks. |
6-Nov-00 |
8 |
Ping and TRACERT to
Lancaster for dial-up problems with RAS Server.Move V-tel videoconferencing
unit to another building for set-up. Install new PC and monitor in Bldg.18.
Configure IP address for HP 4000 printer. |
7-Nov-00 |
8 |
Troubleshoot various user
problems throughout the Medical Center. Moved various monitors, PC's,
Monitors, and Printers in and out of storage. |
8-Nov-00 |
8 |
Assisted in moving ICU to a
new location in Bldg. 1. Moved 2 printers, 3 PC's, one hub, and one bar code
machine. Configured IP address for new Lexmark network printer and delivered
it to building 18. Assisted in the install of Accu-Med/Accu-Max software for
extended patient care on PDC. |
9-Nov-00 |
6 |
Metting on status of
Chipcom/3Com closets for future work. Install and check battery in Roamabout
wireless laptop. Assist in equipment move from 17-5 closet. |
10-Nov-00 |
off |
Vetern's Day Holiday. |
20-Nov-00 |
|
|
|
|
|
|
|
|
Total Hours |
126 |
|
|
|
|